Bob Webb Power Point Presentation May 11, 2009 (360.5 KiB, 2,831 hits, )

F-35 Landing WAV (1.9 MiB, 1,455 hits, What you will hear on the audio clip is 6 separate aircraft landing on Eglin Runway 12, April 22, 2009 when the F-35 visited Eglin. Each aircraft landing sound is separated by approximately 3 seconds of silence. The first three sounds are 33rd TWF F-15 aircraft landing. The next sounds are of the F-35, first doing a Gear-Up Touch and Go type pass on the runway and then landing. The last sound is the F-16 chase aircraft landing. The audio clip you will hear is a continuous digital recording with absolutely NO EDITING except for cutting out the "dead air" time between landings. This was done because the original real time recording was approximately 20 minutes long. Because these aircraft were recorded (with professional equipment by an audio professional) within a 20 minute span of time and in one continuous file, the relative noise level data is irrefutable.)

F-35 Landing MP3 (1.9 MiB, 1,089 hits, What you will hear on the audio clip is 6 separate aircraft landing on Eglin Runway 12, April 22, 2009 when the F-35 visited Eglin. Each aircraft landing sound is separated by approximately 3 seconds of silence. The first three sounds are 33rd TWF F-15 aircraft landing. The next sounds are of the F-35, first doing a Gear-Up Touch and Go type pass on the runway and then landing. The last sound is the F-16 chase aircraft landing. The audio clip you will hear is a continuous digital recording with absolutely NO EDITING except for cutting out the "dead air" time between landings. This was done because the original real time recording was approximately 20 minutes long. Because these aircraft were recorded (with professional equipment by an audio professional) within a 20 minute span of time and in one continuous file, the relative noise level data is irrefutable.)

Ltr from Mayor to Residents May 4, 2009 (1.1 MiB, 791 hits, )

Judge Remington Rulings April 17, 2009 (367.4 KiB, 1,031 hits, )

NEPA Complaint (3.3 MiB, 958 hits, )


ROD BRAC 2005 (815.6 KiB, 757 hits, )

Ltr Sent to School Board March 2009 (137.7 KiB, 743 hits, )

School Board Response March 2009 (65.6 KiB, 805 hits, )

Letter to Residents from Mayor Arnold (892.5 KiB, 1,295 hits, )

JLUS Letter - Sent to Chairman Bill Roberts - Dtd 6/9/2009 (451.5 KiB, 339 hits, )

Ltr to Secretary Billings Runway options March 9 2009.pdf (2.9 MiB, 509 hits, )

Ms._Ferguson_letter.pdf (128.9 KiB, 408 hits, )

Letter to Valparaiso Residents - Nov 20, 2008 (430.1 KiB, 716 hits, )


Response to Final EIS - Oct 29, 2008 (210.1 KiB, 568 hits, )


Letter to VA & HUD - Oct 10, 2008 (471.9 KiB, 637 hits, )


Response from VA - Nov 20, 2008 (195.1 KiB, 547 hits, )


Letter to Senators and Congressman - Oct 23, 2008 (545.3 KiB, 577 hits, )


Navy ROD (127.6 KiB, 643 hits, )

Special Newsletter for Valparaiso Residents (253.0 KiB, 2,228 hits, )

Information concerning the Joint Land Use Study

———————————————

Interim Draft Report for the Tri-County Joint Land Use Study

———————————————

Tri-County Growth Management Plan / JLUS Website

———————————————

The City of Valparaiso responded to the Draft EIS Dated May 9, 2008 below are the 3 Items that were sent in:

Valparaiso's Comments on Draft EIS Dated May 9, 2008 (5.4 MiB, 948 hits, )


Draft EIS Map of ALT 1 on May 9, 2008 (5.9 MiB, 1,002 hits, )


Draft EIS Map of ALT 2 on May 9, 2008 (5.9 MiB, 905 hits, )

———————————————

Current JLUS Noise Map provide by Okaloosa County Alternative 1

Current JLUS Noise Map provide by Okaloosa County Alternative 2

First Comments for BRAC Implementation (193.4 KiB, 1,125 hits, )


Noise Contours Map (1.1 MiB, 1,531 hits, )

———————————————

Eglin BRAC EIS Draft Study